已选(0)清除
条数/页: 排序方式: |
| Electric Power Generation from Low to Intermediate Temperature Resources 科技报告 报告编号: Final Report DOE EE00271--1. 出版年: 2015 作者: Gosnold, William D. [Univ. of North Dakota, Grand Forks, ND (United States)] 收藏  |  浏览/下载:27/0  |  提交时间:2019/11/30 |
| Using Snow Fences to Augument Fresh Water Supplies in Shallow Arctic Lakes 科技报告 . 出版年: 2013 作者: Stuefer, Svetlana 收藏  |  浏览/下载:2/0  |  提交时间:2019/11/30 |
| Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects 科技报告 报告编号: ANL/EVS/R--12/8. 出版年: 2013 作者: Clark, Corrie E. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Harto, Christopher B. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Schroeder, Jenna N. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Martino, Louis E. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Horner, Robert M. [Argonne National Lab. (ANL), Argonne, IL (United States)] 收藏  |  浏览/下载:1/0  |  提交时间:2019/11/30 |
| RENEWABLE ENERGY AND ENVIRONMENTAL SUSTAINABILITY USING BIOMASS FROM DAIRY AND BEEF ANIMAL PRODUCTION 科技报告 报告编号: DOE/FG/85003-2. 出版年: 2012 作者: Kalyan Annamalai, John M. Sweeten, Brent W. Auvermann, Saqib Mukhtar, Sergio Caperada Cady R. Engler, Wyatte Harman Reddy JN Robert Deotte 收藏  |  浏览/下载:5/0  |  提交时间:2019/11/30 |
| TECTONIC VERSUS VOLCANIC ORIGIN OF THE SUMMIT DEPRESSION AT MEDICINE LAKE VOLCANO, CALIFORNIA 科技报告 报告编号: DOE/GO/14298. 出版年: 2010 作者: Mark Leon Gwynn 收藏  |  浏览/下载:1/0  |  提交时间:2019/11/30 |
| The Proceedings of the 28th SLAC Summer Institute on Particle Physics: Neutrinos From The Lab, The Sun, And The Cosmos (SSI 2000) 科技报告 报告编号: SLAC-R-720. 出版年: 2004 作者: Jaros, J 收藏  |  浏览/下载:0/0  |  提交时间:2019/11/30 |
| Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D 科技报告 报告编号: DOE/EIS--0150D-Vol.4. 出版年: 1994 作者: [unavailable] 收藏  |  浏览/下载:1/0  |  提交时间:2019/11/30 |
| Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A 科技报告 报告编号: DOE/EIS--0150D-Vol.3. 出版年: 1994 作者: [unavailable] 收藏  |  浏览/下载:10/0  |  提交时间:2019/11/30 |
| Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16 科技报告 报告编号: DOE/EIS--0150D-Vol.2. 出版年: 1994 作者: [unavailable] 收藏  |  浏览/下载:1/0  |  提交时间:2019/11/30 |
| Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1 科技报告 报告编号: DOE/UMTRA--3050-93-1235-Vol.1. 出版年: 1993 作者: [unavailable] 收藏  |  浏览/下载:0/0  |  提交时间:2019/11/30 |