Arid

浏览/检索结果: 共6条,第1-6条 帮助

已选(0)清除 条数/页:   排序方式:
Operational Performance and Degradation Influenced Life Cycle Environmental-Economic Metrics of mc-Si, a-Si and HIT Photovoltaic Arrays in Hot Semi-arid Climates 期刊论文
发表期刊: SUSTAINABILITY. 出版年: 2020, 卷号: 12, 期号: 3
作者:  Rajput, Pramod;  Malvoni, Maria;  Kumar, Nallapaneni Manoj;  Sastry, O. S.;  Jayakumar, Arunkumar
收藏  |  浏览/下载:24/0  |  提交时间:2020/05/22
photovoltaic systems  PV cells  amorphous silicon  HIT  crystalline solar cells  degradation rate  life cycle assessment  life cycle metrics  energy payback time  annualized uniform cost  
Environmental impact analysis of power generation from biomass and wind farms in different locations 期刊论文
发表期刊: RENEWABLE & SUSTAINABLE ENERGY REVIEWS. 出版年: 2019, 卷号: 102, 页码: 307-317
作者:  Gao, Cheng-kang;  Na, Hong-ming;  Song, Kai-hui;  Dyer, Noel;  Tian, Fan;  Xu, Qing-jiang;  Xing, Yu-hong
收藏  |  浏览/下载:21/0  |  提交时间:2019/11/29
Life cycle assessment (LCA)  Biomass power generation  Wind farm  Environmental impact analysis  Different locations  Energy payback time  
GHG Emissions and Energy Payback Time of AC Electricity Generated by the SunPower (R) Oasis (R) Photovoltaic Power Plant 会议论文
会议名称: IEEE 42nd Photovoltaic Specialist Conference (PVSC). 会议地点: New Orleans, LA. 会议日期: JUN 14-19, 2015
作者:  Francke, Loic;  Armand, Marie-Sophie;  Oeser, Craig;  Yao, Marissa
收藏  |  浏览/下载:15/0  |  提交时间:2019/12/09
Life cycle assessment  greenhouse gases emission  energy payback time  high efficiency solar cells  monocrystalline silicon  back-contact cell  tracking system  photovoltaic power plant  
GHG Emissions and Energy Payback Time of AC Electricity Generated by the SunPower (R) Oasis (R) Photovoltaic Power Plant 会议论文
会议名称: IEEE 42nd Photovoltaic Specialist Conference (PVSC). 会议地点: New Orleans, LA. 会议日期: JUN 14-19, 2015
作者:  Francke, Loic;  Armand, Marie-Sophie;  Oeser, Craig;  Yao, Marissa
收藏  |  浏览/下载:22/0  |  提交时间:2019/12/09
Life cycle assessment  greenhouse gases emission  energy payback time  high efficiency solar cells  monocrystalline silicon  back-contact cell  tracking system  photovoltaic power plant  
Life cycle assessment and evaluation of energy payback time on high-concentration photovoltaic power generation system 期刊论文
发表期刊: APPLIED ENERGY. 出版年: 2010, 卷号: 87, 期号: 9, 页码: 2797-2807
作者:  Nishimura, A.;  Hayashi, Y.;  Tanaka, K.;  Hirota, M.;  Kato, S.;  Ito, M.;  Araki, K.;  Hu, E. J.
收藏  |  浏览/下载:9/0  |  提交时间:2019/11/29
High-concentration photovoltaic power generation system  Life cycle assessment  Energy payback time  Gobi desert  
A comparative study on cost and life-cycle analysis for 100 MW very large-scale PV (VLS-PV) systems in deserts using m-Si, a-Si, CdTe, and CIS modules 期刊论文
发表期刊: PROGRESS IN PHOTOVOLTAICS. 出版年: 2008, 卷号: 16, 期号: 1, 页码: 17-30
作者:  Ito, Masakazu;  Kato, Kazuhiko;  Komoto, Keiichi;  Kichimi, Tetsuo;  Kurokawa, Kosuke
收藏  |  浏览/下载:7/0  |  提交时间:2019/11/28
VLS-PV  LCA  desert  energy payback time  CO2  cost