干热沙漠地区大体积混凝土底板施工温控分析
其他题名TEMPERATURE CONTROL IN CONSTRUCTION PROCESS FOR MASS CONCRETE FOUNDATION SLAB IN HOT AND DRY DESERT AREA
秦会来; 周予启; 陈青; 吴字; 周乐
来源期刊工业建筑
ISSN1000-8993
出版年2020
卷号50期号:11页码:190-194
中文摘要埃及新行政首都中央商务区项目P4标段为在炎热干燥沙漠地区修建的超高层项目,该项目的筏板基础厚度较大,局部厚度达到了5.45 m。为保证基础底板的整体性,混凝土浇筑采用一次性连续整体浇筑的方式。通过优化底板混凝土配合比、降低混凝土入模温度、有限元水化热分析、混凝土温度监 测指导养护等多种措施,确保了大体积混凝土整体连续施工的施工质量。
英文摘要The P4 section of the new Egyptian Administrative Capital CBD project is a super-high-rise project built in the hot and dry desert area. The raft foundation of the project is relatively thick, with a local thickness of 5.45 meters. In order to ensure the integrity of the foundation slab, the concrete pouring adopted the way of continuous pouring in one time. Based on this project, through optimizing the mix proportion of concrete in the base plate, reducing the temperature of concrete in the mold,the finite element analysis of hydration heat,concrete temperature monitoring and guiding curing,and other measures,the construction quality of continuous construction of mass concrete as a whole was ensured.
中文关键词大体积混凝土 ; 温度场 ; 水化热 ; 数值模拟
英文关键词mass concrete temperature field hydration heat numerical simulation
类型Article
语种中文
收录类别CSCD
WOS类目Construction & Building Technology
CSCD记录号CSCD:6886520
资源类型期刊论文
条目标识符http://119.78.100.177/qdio/handle/2XILL650/353565
作者单位秦会来, 中建一局集团建设发展有限公司, 北京 100102, 中国. 周予启, 中建一局集团建设发展有限公司, 北京 100102, 中国. 陈青, 中建一局集团建设发展有限公司, 北京 100102, 中国. 吴字, 中建一局集团建设发展有限公司, 北京 100102, 中国. 周乐, 中建一局集团建设发展有限公司, 北京 100102, 中国.
推荐引用方式
GB/T 7714
秦会来,周予启,陈青,等. 干热沙漠地区大体积混凝土底板施工温控分析[J],2020,50(11):190-194.
APA 秦会来,周予启,陈青,吴字,&周乐.(2020).干热沙漠地区大体积混凝土底板施工温控分析.工业建筑,50(11),190-194.
MLA 秦会来,et al."干热沙漠地区大体积混凝土底板施工温控分析".工业建筑 50.11(2020):190-194.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[秦会来]的文章
[周予启]的文章
[陈青]的文章
百度学术
百度学术中相似的文章
[秦会来]的文章
[周予启]的文章
[陈青]的文章
必应学术
必应学术中相似的文章
[秦会来]的文章
[周予启]的文章
[陈青]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。