英文摘要Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project.
英文关键词Construction Production Cost of Labour building project weather conditions target quantity
类型Article
语种英语
开放获取类型DOAJ Gold
收录类别ESCI
WOS记录号WOS:000504078100001
WOS类目Engineering, Civil
WOS研究方向Engineering
资源类型期刊论文
条目标识符http://119.78.100.177/qdio/handle/2XILL650/334004
作者单位[Bhatti, Imtiaz Ali; Abdullah, Abd Halid; Nagapan, Sasitharan; Mahar, Muntazir Mahdi] Univ Tun Hussein Onn Malaysia Pant Raja, Fac Civil & Environm Engn, Johor Baharu, Malaysia; [Bhatti, Nabi Bux] Mehran Univ Engn & Technol, US Pakistan Ctr Adv Studies Water, Sindh, Pakistan; [Lakhiar, Muhammad Tahir] Natl Univ Sci & Technol, Dept Civil Engn, Quetta Campus, Balouchistan, Pakistan
推荐引用方式
GB/T 7714
Bhatti, Imtiaz Ali,Abdullah, Abd Halid,Nagapan, Sasitharan,et al. BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT[J],2019,9(2):125-130.
APA Bhatti, Imtiaz Ali,Abdullah, Abd Halid,Nagapan, Sasitharan,Bhatti, Nabi Bux,Lakhiar, Muhammad Tahir,&Mahar, Muntazir Mahdi.(2019).BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT.JOURNAL OF APPLIED ENGINEERING SCIENCES,9(2),125-130.
MLA Bhatti, Imtiaz Ali,et al."BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT".JOURNAL OF APPLIED ENGINEERING SCIENCES 9.2(2019):125-130.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Bhatti, Imtiaz Ali]的文章
[Abdullah, Abd Halid]的文章
[Nagapan, Sasitharan]的文章
百度学术
百度学术中相似的文章
[Bhatti, Imtiaz Ali]的文章
[Abdullah, Abd Halid]的文章
[Nagapan, Sasitharan]的文章
必应学术
必应学术中相似的文章
[Bhatti, Imtiaz Ali]的文章
[Abdullah, Abd Halid]的文章
[Nagapan, Sasitharan]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。