Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.2478/jaes-2019-0017 |
BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT | |
Bhatti, Imtiaz Ali; Abdullah, Abd Halid; Nagapan, Sasitharan; Bhatti, Nabi Bux; Lakhiar, Muhammad Tahir; Mahar, Muntazir Mahdi | |
通讯作者 | Bhatti, IA |
来源期刊 | JOURNAL OF APPLIED ENGINEERING SCIENCES
![]() |
ISSN | 2247-3769 |
EISSN | 2284-7197 |
出版年 | 2019 |
卷号 | 9期号:2页码:125-130 |
英文摘要 | Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project. |
英文关键词 | Construction Production Cost of Labour building project weather conditions target quantity |
类型 | Article |
语种 | 英语 |
开放获取类型 | DOAJ Gold |
收录类别 | ESCI |
WOS记录号 | WOS:000504078100001 |
WOS类目 | Engineering, Civil |
WOS研究方向 | Engineering |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/334004 |
作者单位 | [Bhatti, Imtiaz Ali; Abdullah, Abd Halid; Nagapan, Sasitharan; Mahar, Muntazir Mahdi] Univ Tun Hussein Onn Malaysia Pant Raja, Fac Civil & Environm Engn, Johor Baharu, Malaysia; [Bhatti, Nabi Bux] Mehran Univ Engn & Technol, US Pakistan Ctr Adv Studies Water, Sindh, Pakistan; [Lakhiar, Muhammad Tahir] Natl Univ Sci & Technol, Dept Civil Engn, Quetta Campus, Balouchistan, Pakistan |
推荐引用方式 GB/T 7714 | Bhatti, Imtiaz Ali,Abdullah, Abd Halid,Nagapan, Sasitharan,et al. BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT[J],2019,9(2):125-130. |
APA | Bhatti, Imtiaz Ali,Abdullah, Abd Halid,Nagapan, Sasitharan,Bhatti, Nabi Bux,Lakhiar, Muhammad Tahir,&Mahar, Muntazir Mahdi.(2019).BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT.JOURNAL OF APPLIED ENGINEERING SCIENCES,9(2),125-130. |
MLA | Bhatti, Imtiaz Ali,et al."BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT".JOURNAL OF APPLIED ENGINEERING SCIENCES 9.2(2019):125-130. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。