Arid
DOI10.2172/975483
报告编号ANL/DIS-10-6
来源IDOSTI_ID: 975483
Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.
Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B; Decision and Information Sciences; Western Area Power Administration
英文摘要On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.
出版年2010
报告类型Technical Report
语种英语
国家美国
来源学科分类13 HYDRO ENERGY ; 24 POWER TRANSMISSION AND DISTRIBUTION ; 29 ENERGY PLANNING, POLICY AND ECONOMY ; CAPACITY ; COLORADO RIVER ; DOLLARS ; ECONOMIC ANALYSIS ; ECONOMIC IMPACT ; ECONOMICS ; ELECTRICITY ; ENVIRONMENTAL IMPACT STATEMENTS ; FLEXIBILITY ; HYDROELECTRIC POWER PLANTS ; MARKET ; POWER SYSTEMS ; PRICES ; PRODUCTION ; STORAGE ; WESTERN AREA POWER ADMINISTRATION
URLhttp://www.osti.gov/scitech/servlets/purl/975483
资源类型科技报告
条目标识符http://119.78.100.177/qdio/handle/2XILL650/270067
推荐引用方式
GB/T 7714
Veselka, T. D.,Poch, L. A.,Palmer, C. S.,et al. Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.,2010.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Veselka, T. D.]的文章
[Poch, L. A.]的文章
[Palmer, C. S.]的文章
百度学术
百度学术中相似的文章
[Veselka, T. D.]的文章
[Poch, L. A.]的文章
[Palmer, C. S.]的文章
必应学术
必应学术中相似的文章
[Veselka, T. D.]的文章
[Poch, L. A.]的文章
[Palmer, C. S.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。