Arid
DOI10.2172/898446
报告编号UCRL-TR-223233
来源IDOSTI_ID: 898446
MANAGEMENT PRE-START REVIEW FINAL REPORT FOR THE BIOSAFETY LEVEL 3 (BSL-3) FACILITY (B368) LAWRENCE LIVERMORE NATIONAL LABORATORY
Hull, R; O'brien, J; Owens, T; Salvo, V; Sassone, D; Tuholski, S J; Tsan, S
英文摘要A Lawrence Livermore National Laboratory (LLNL) Management Pre-Start Review (MPR) Team was formed to independently verify the operational readiness of Building 368 (B368) Biosafety Level III (BSL-3) Facility to conduct research with biological pathogens and toxins including those considered Select Agents. Review objectives and criteria were developed from the DOE/NNSA and LLNL requirements. These were provided in the Implementation Plan for the Biosafety Level III (BSL-3) Facility Management Pre-Start Review (BSL-3 MPR) at Lawrence Livermore National Laboratory that was reviewed and approved by DOE/NNSA-LSO. The formal part of the LLNL MPR for the BSL-3 Facility was begun in August of 2005 but work on the MPR was stopped in October of 2005 due to the need for LLNL to reassess organizational and operational controls and respond to Centers for Disease Control and Prevention inquiries related to a shipping incident involving select agents. The MPR was restarted in mid-June of 2006. Preliminary facility tours and familiarization with project documents took place in June of 2005. The Independent Management Review Team consists of seven members led by a Team Leader with expertise in management, operations, and safety basis experience with biosafety laboratories. Other team members have expertise in electrical engineering, security, environmental/waste management/regulatory compliance, biosafety/industrial hygiene/medical, structural engineering, and mechanical engineering. The MPR Team reviewed various documents, including authorization basis, safety, emergency preparedness, and various operations, configuration, and management plans. They also reviewed building plans, equipment repair/maintenance documents, training records, and many standard operating procedures. The MPR resulted in three Pre-Start Findings, one Post-Start/Critical Finding, and four observations which are shown on Tables 1, 2, and 3, respectively. Based upon this review the Team feels that the B368 Facility can be operated safely provided the Pre-Start Findings are satisfactorily closed. The Team therefore seen no reason not to expeditiously proceed towards the startup of this facility in accordance with the processes defined in DOE Order 425.1C, and the LLNL ES&H Manual. Details of the MPR Team evaluations of the various Subject (functional) Areas of the review are contained in the completed MPR Assessment Forms in Appendix A. Findings are described in completed MPR Deficiency Forms in Appendix B. The format of these forms is consistent with DOE-STD-3006.
出版年2006
报告类型Technical Report
语种英语
国家美国
来源学科分类59 BASIC BIOLOGICAL SCIENCES ; COMPLIANCE ; CONFIGURATION ; DISEASES ; ELECTRICAL ENGINEERING ; IMPLEMENTATION ; LAWRENCE LIVERMORE NATIONAL LABORATORY ; MANAGEMENT ; MECHANICAL ENGINEERING ; PATHOGENS ; SAFETY ; SECURITY ; TOXINS ; TRAINING
URLhttp://www.osti.gov/scitech/servlets/purl/898446
资源类型科技报告
条目标识符http://119.78.100.177/qdio/handle/2XILL650/269218
推荐引用方式
GB/T 7714
Hull, R,O'brien, J,Owens, T,et al. MANAGEMENT PRE-START REVIEW FINAL REPORT FOR THE BIOSAFETY LEVEL 3 (BSL-3) FACILITY (B368) LAWRENCE LIVERMORE NATIONAL LABORATORY,2006.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Hull, R]的文章
[O'brien, J]的文章
[Owens, T]的文章
百度学术
百度学术中相似的文章
[Hull, R]的文章
[O'brien, J]的文章
[Owens, T]的文章
必应学术
必应学术中相似的文章
[Hull, R]的文章
[O'brien, J]的文章
[Owens, T]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。