Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.2172/594542 |
报告编号 | DOE/OR/21548--595 |
来源ID | OSTI_ID: 594542 |
Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri | |
[unavailable] | |
英文摘要 | The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area. |
出版年 | 1998 |
报告类型 | Technical Report |
语种 | 英语 |
国家 | 美国 |
来源学科分类 | 05 NUCLEAR FUELS ; 54 ENVIRONMENTAL SCIENCES ; FEASIBILITY STUDIES ; REMEDIAL ACTION ; MISSOURI ; SOILS ; RADIOECOLOGICAL CONCENTRATION ; RADIONUCLIDE MIGRATION ; URANIUM ; RADIOACTIVE WASTES ; GROUND DISPOSAL |
URL | http://www.osti.gov/scitech/servlets/purl/594542 |
资源类型 | 科技报告 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/267451 |
推荐引用方式 GB/T 7714 | [unavailable]. Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri,1998. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[[unavailable]]的文章 |
百度学术 |
百度学术中相似的文章 |
[[unavailable]]的文章 |
必应学术 |
必应学术中相似的文章 |
[[unavailable]]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。