Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.2172/1238045 |
报告编号 | ANL/EVS/TM--15/2 |
来源ID | OSTI_ID: 1238045 |
Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho | |
Martino, L. E. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Jerden, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Kimmell, T. A. [Argonne National Lab. (ANL), Argonne, IL (United States)]; Quinn, J. [Argonne National Lab. (ANL), Argonne, IL (United States)] | |
英文摘要 | If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal. |
出版年 | 2016 |
报告类型 | Technical Report |
语种 | 英语 |
国家 | 美国 |
来源学科分类 | 54 ENVIRONMENTAL SCIENCES |
URL | http://www.osti.gov/scitech/servlets/purl/1238045 |
资源类型 | 科技报告 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/260663 |
推荐引用方式 GB/T 7714 | Martino, L. E. [Argonne National Lab. ,Jerden, J. J. [Argonne National Lab. ,Kimmell, T. A. [Argonne National Lab. ,et al. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho,2016. |