中文摘要正确计算排涝模数,对于确定排涝工程的适宜规模具有重要现实意义。该文以湖北省四湖流域螺山排区为例,根据排区下垫面条件进行产流计算,分别采用经验公式法和平均排除法计算不同排涝标准下的排涝模数,分析2种计算方法中排涝天数、排涝模数及排涝重现期之间的关系。结果表明:经验公式法对应于平均排除法的排涝天数为3.5d。当经验公式法求得的排涝模数小于平均排除法求得的排涝模数时(本区对应排涝天数小于3.5d),选用平均排除法计算排涝模数偏于安全;而当经验公式法求得的排涝模数大于平均排除法求得的排涝模数时(本区对应排涝天数大于3.5d),则选用经验公式法计算排涝模数偏于安全。此外,在排涝模数确定的条件下(即工程的排水能力一定),采用不同的排水公式校核排水标准时存在差异。一日暴雨时,采用平均排除法(采用三日排除)10年一遇和20年一遇的设计标准分别相当于经验公式法15年一遇和33年一遇的设计标准;而在三日暴雨下,平均排除法(采用五日排除)10年一遇和20年一遇的设计标准则分别相当于经验公式法4年一遇和7年一遇的设计标准。研究成果对合理选择排涝模数计算方法具有一定参考价值。
英文摘要The correct calculation of drainage modulus is of important practical significance for the determination of the suitable scale of water logging control projects. Taking the Luoshan drainage area in Four-lake Watershed in Hubei Province as an example, based on the runoff generation characteristics of underlying surfaces in the drainage area, the drainage area was classified into 4 kinds of underlying surfaces, i.e. the paddy field, the arid land (including wasteland), the water surface, and the building plot. Then the runoff of different underlying surfaces was calculated respectively. Drainage moduli under different water logging control standards were calculated with the empirical formula and average draining method respectively. Then the relationship between days of drainage for water logging control, drainage moduli and return periods derived from both calculation methods was analyzed. Results showed that the corresponding days of drainage for water logging control calculated by the empirical formula were 3.5 days. When drainage moduli calculated by the empirical formula were less than that by the average draining method, days of drainage for water logging control were less than 3.5 days in the drainage area. Then drainage moduli calculated by the average draining method were suggested to ensure the project safety. However, when drainage moduli calculated by the empirical formula were more than that by the average draining method, days of drainage for water logging control were more than 3.5 days in the drainage area. So drainage moduli calculated by the empirical formula were relatively safe. In addition, if drainage moduli were determined, the drainage standard checked with different methods was different. The design standards with return periods of 10 years and 20 years and the water logging discharge duration of three days derived from the average draining method were equivalent to design standards with return periods of 15 years and 33 years derived from the empirical formula under one-day rainstorm respectively. However, design standards with return periods of 10 years and 20 years and the water logging discharge duration of five days derived from the average draining method were equivalent to design standards with return periods of 4 years and 7 years derived from the empirical formula under three-day rainstorm, respectively. This research can be used as a reference for reasonable selection methods for calculating drainage modulus.
中文关键词排水 ; 降雨 ; 径流 ; 排涝标准 ; 经验公式法 ; 平均排除法 ; 重现期 ; 排涝天数
英文关键词drainage rain runoff water logging control standard empirical formula average draining method return period days of drainage for water logging control
语种中文
国家中国
收录类别CSCD
WOS类目AGRICULTURAL ENGINEERING
WOS研究方向Agriculture
CSCD记录号CSCD:4852631
资源类型期刊论文
条目标识符http://119.78.100.177/qdio/handle/2XILL650/229889
作者单位武汉大学, 水资源与水电工程科学国家重点试验室, 武汉, 湖北 430072, 中国
推荐引用方式
GB/T 7714
罗文兵,王修贵,罗强. 农田排涝模数计算方法的比较[J],2013,29(11):85-91.
APA 罗文兵,王修贵,&罗强.(2013).农田排涝模数计算方法的比较.农业工程学报,29(11),85-91.
MLA 罗文兵,et al."农田排涝模数计算方法的比较".农业工程学报 29.11(2013):85-91.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[罗文兵]的文章
[王修贵]的文章
[罗强]的文章
百度学术
百度学术中相似的文章
[罗文兵]的文章
[王修贵]的文章
[罗强]的文章
必应学术
必应学术中相似的文章
[罗文兵]的文章
[王修贵]的文章
[罗强]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。