Knowledge Resource Center for Ecological Environment in Arid Area
古尔班通古特沙漠重大工程扰动地表稳定性与恢复研究 | |
其他题名 | The Disturbance Effect of Construction Projects on Land Surface Stability and Rehabilitation Strategy in Gurbantunggut Desert |
王雪芹1; 蒋进1; 雷加强1![]() ![]() | |
ISSN | 1007-7588 |
出版年 | 2006 |
卷号 | 28期号:5页码:190-195 |
中文摘要 | 古尔班通古特沙漠是中国最大的固定、半固定沙漠,沙丘类型以纵向沙垄为主.沙垄垄间和坡中下部沙面较为稳定,仅在沙垄顶部存在10m~40m宽度不等的流动带,风沙活动规律独特.近年来在沙漠腹地修筑的公路、引水渠等重大工程建设项目,不可避免地造成沙垄切割和保护层破坏,所引发的工程安全和生态安全等问题引起了人们的普遍关注.本文在大量实地观测的基础上,研究重大工程扰动地表后的沙面非稳定性问题、主要工程沙害及植被恢复建设等,以期为古尔班通古特沙漠特殊环境条件下的工程安全和生态恢复提供理论支持. |
英文摘要 | Gurbantunggut Desert, with the main dune type of semi - fixed longitudinal dunes, is the second largest desert in China. The sand surface in interdune and on both slopes is stabilized by vegetation and biological crust while there is a mobile belt with 1 040m width on the top of dune. Resent years some great engineering, such as highway, oil field and water channel projects etc. , disturbed the sand surface that affected the desert stabilization directly. This paper, based on a great deal of field work, study on the stability of human disturbed sand surface, main sand disasters to the engineering and vegetation rehabilitation etc. , that will provide the theory basis for both engineering and ecology safety in the desert. Compared with natural ground surface, there is a stronger total surface activity on human disturbed sand surface. However, the straw checkerboard can stabilize it effectively. Without a protection system the engineering projects face the direct threat of sand erosion and deposition. This usually occurs when the cutting heads of the dunes move from north to south and bury the projects. Protection using only straw checkerboards on the disturbed face was largely ineffectual because sand moving along the top of the dune rapidly buried the protective system. Fill from the excavation of the longitudinal dune was placed on the interdune area, leading to the formation of a small but relatively steep sand slope. Although, the fill area was fixed with straw checkboards the steepness of the man - made slope means that this surface is prone to erosion from the dominant northerly winds. The key point of protection should be the cutting head of the longitudinal dune. On the one hand, the high barrier system should be set up on the top of dune in order to decrease wind velocity and block the blown - sand. On the other hand, straw checker-board should cover a significant area along the active belt and decrease the sand source. In the interdune area a gently sloping face should be created on the sand fill. Restoration of vegetation should be implemented after establishing the mechanical protection system. According to the environment conditions of Gurbantunggut Desert, using melting snow and falling water in spring to make artificial forest shelter system following disturbance of engineering is possible. Soil water in arid area is an important limit factor for plant germination and growth and so suitable plant species should be selected in different slopes and different engineering sections. The soil depth layer influenced by precipitation in Gurbantunggut Desert is confined to no more than 60 cm, therefore herbage should be enhanced to a definite level for restoration of vegetation. When planting dwarf trees and shrubs ecological characteristics of different species, their density and irrigation technique should be considered. The biological crust and herbage community layer will recover with time and the stability of artificial forest need further investigate. |
中文关键词 | 古尔班通古特沙漠 ; 工程扰动地表 ; 沙面蚀积变化 ; 工程沙害 ; 植被恢复 |
英文关键词 | Gurbantunggut desert Disturbed sand surface Sand disasters to the engineering Restoration of vegetation |
语种 | 中文 |
国家 | 中国 |
收录类别 | CSCD |
WOS类目 | ENVIRONMENTAL SCIENCES |
WOS研究方向 | Environmental Sciences & Ecology |
CSCD记录号 | CSCD:2431063 |
来源机构 | 中国科学院新疆生态与地理研究所 |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/220585 |
作者单位 | 1.中国科学院新疆生态与地理研究所, 乌鲁木齐, 新疆 830011, 中国; 2.新疆阜康市林业局, 阜康, 新疆 831500, 中国 |
推荐引用方式 GB/T 7714 | 王雪芹,蒋进,雷加强,等. 古尔班通古特沙漠重大工程扰动地表稳定性与恢复研究[J]. 中国科学院新疆生态与地理研究所,2006,28(5):190-195. |
APA | 王雪芹,蒋进,雷加强,徐新文,钱亦兵,&潘存文.(2006).古尔班通古特沙漠重大工程扰动地表稳定性与恢复研究.,28(5),190-195. |
MLA | 王雪芹,et al."古尔班通古特沙漠重大工程扰动地表稳定性与恢复研究".28.5(2006):190-195. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[王雪芹]的文章 |
[蒋进]的文章 |
[雷加强]的文章 |
百度学术 |
百度学术中相似的文章 |
[王雪芹]的文章 |
[蒋进]的文章 |
[雷加强]的文章 |
必应学术 |
必应学术中相似的文章 |
[王雪芹]的文章 |
[蒋进]的文章 |
[雷加强]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。