Arid
西气东输管道工程陕西段新增土壤流失预测
其他题名Additional Soil Erosion Predication of Natural Gas Pipe Project from West to East in Shaanxi Province
付良勇; 寇权; 张鉴; 王存荣
来源期刊水土保持通报
ISSN1000-288X
出版年2005
卷号25期号:4页码:45-47
中文摘要西气东输管道工程陕西段全长346.20 km,工程建设中扰动破坏原地貌和地表植被,产生大量弃土弃渣.经分析计算,新增土壤流失8.35*105 t,其中扰动破坏原地貌新增土壤流失量为6.80*105 t,占总流失量的81.41%;弃土弃渣流失量为1.55*105 t,占总流失量的18.59%.扰动破坏原地貌造成新增土壤流失是防治的重点,必须采取切实可行的防治措施.
英文摘要The overall length ol Shaanxi Province from West-to-East-Natural-Gas-Pipe-Project is 346. 2km. Due to (Ik.’ project const ruction, vegetation on the original land has been distroyed with a consequence of large quantity of deserted soil, dregs and remains. According to analysis, newly additional soil erosion amounts to 8354 000 tons, of which descried soil is up to 6 800 000 tons, occupying 81.40 percent out of the total volumn, deserted dregs and remains is to up to 1 553 000 tons, occupying 18. 59 percent of the total. Practical measures are supposed to be tak-en io com roll soil erosion caused by the project constrution.
中文关键词西气东输 ; 管道工程 ; 新增土壤流失量 ; 预测
英文关键词West-to-Easl-Natural-Gas pipe project newly additional soil erosion volume prediction
语种中文
国家中国
收录类别CSCD
WOS类目AGRICULTURE MULTIDISCIPLINARY ; ENERGY FUELS
WOS研究方向Agriculture ; Energy & Fuels
CSCD记录号CSCD:2009959
资源类型期刊论文
条目标识符http://119.78.100.177/qdio/handle/2XILL650/206625
作者单位黄河水利委员会西峰水土保持科学试验站, 西峰, 甘肃 745000, 中国
推荐引用方式
GB/T 7714
付良勇,寇权,张鉴,等. 西气东输管道工程陕西段新增土壤流失预测[J],2005,25(4):45-47.
APA 付良勇,寇权,张鉴,&王存荣.(2005).西气东输管道工程陕西段新增土壤流失预测.水土保持通报,25(4),45-47.
MLA 付良勇,et al."西气东输管道工程陕西段新增土壤流失预测".水土保持通报 25.4(2005):45-47.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[付良勇]的文章
[寇权]的文章
[张鉴]的文章
百度学术
百度学术中相似的文章
[付良勇]的文章
[寇权]的文章
[张鉴]的文章
必应学术
必应学术中相似的文章
[付良勇]的文章
[寇权]的文章
[张鉴]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。