Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.1007/s11269-017-1665-y |
A New Evaluation for Water Transfer Optimal Schemes with the Consideration of Reliability, Stability, and Severity | |
Li, Xue-Ying1; Li, Fang-Fang1; Qiu, Jun2 | |
通讯作者 | Li, Fang-Fang ; Qiu, Jun |
来源期刊 | WATER RESOURCES MANAGEMENT
![]() |
ISSN | 0920-4741 |
EISSN | 1573-1650 |
出版年 | 2017 |
卷号 | 31期号:9页码:2823-2836 |
英文摘要 | To alleviate the water resources shortage in arid or semi-arid area, various water transfer projects have been constructed and put into operation over the last few decades. Apart from the available water, the allocation scheme also determines whether the water demands alongside can be satisfied well. Different from traditional evaluation without considering how often the failure occurs and how severe magnitude the failure may be when operating a scheme, this study proposes three indexes to evaluate scheme performance comprehensively, which are: (1) the satisfaction degree of a selected scheme (reliability); (2) the ability of the system to recover from a failure to satisfactory state (stability); and (3) the maximum damage of operating a scheme (severity). To illustrate the application of these evaluation indexes, an optimization model and an exponent describing differences among schemes are established, and then applied to the east route South-to-North Water Transfer project in China. The result shows that there exist tradeoffs among scheme’s benefits, which is described by reliability, stability, and severity. And with the increase of the exponent, the optimal scheme would consider deficit distribution more. In order to make the water transfer system with high reliability, high stability, and low severity, the exponent should be in the range of 1.0-2.0. These findings can be taken as the references to the operation of the water transfer projects. |
英文关键词 | Water transfer Scheme evaluation Linear programming South-north water transfer project |
类型 | Article |
语种 | 英语 |
国家 | Peoples R China |
收录类别 | SCI-E |
WOS记录号 | WOS:000403011300018 |
WOS关键词 | MULTI-RESERVOIR OPTIMIZATION ; 3 GORGES SYSTEM ; GENETIC ALGORITHM ; OPTIMAL OPERATION ; PROJECT ; MODEL |
WOS类目 | Engineering, Civil ; Water Resources |
WOS研究方向 | Engineering ; Water Resources |
来源机构 | 中国农业大学 ; 清华大学 |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/202883 |
作者单位 | 1.China Agr Univ, Coll Water Resources & Civil Engn, Beijing 100083, Peoples R China; 2.Tsinghua Univ, Inst Aeroengine, Sch Aerosp Engn, Beijing 100084, Peoples R China |
推荐引用方式 GB/T 7714 | Li, Xue-Ying,Li, Fang-Fang,Qiu, Jun. A New Evaluation for Water Transfer Optimal Schemes with the Consideration of Reliability, Stability, and Severity[J]. 中国农业大学, 清华大学,2017,31(9):2823-2836. |
APA | Li, Xue-Ying,Li, Fang-Fang,&Qiu, Jun.(2017).A New Evaluation for Water Transfer Optimal Schemes with the Consideration of Reliability, Stability, and Severity.WATER RESOURCES MANAGEMENT,31(9),2823-2836. |
MLA | Li, Xue-Ying,et al."A New Evaluation for Water Transfer Optimal Schemes with the Consideration of Reliability, Stability, and Severity".WATER RESOURCES MANAGEMENT 31.9(2017):2823-2836. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。