Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.1016/j.geomorph.2016.05.001 |
Monitoring channel head erosion processes in response to an artificially induced abrupt base level change using time-lapse photography | |
Nichols, M. H.; Nearing, M.; Hernandez, M.; Polyakov, V. O. | |
通讯作者 | Nichols, M. H. |
来源期刊 | GEOMORPHOLOGY
![]() |
ISSN | 0169-555X |
EISSN | 1872-695X |
出版年 | 2016 |
卷号 | 265页码:107-116 |
英文摘要 | Gullies that terminate at a vertical-wall are ubiquitous throughout arid and semiarid regions. Multi-year assessments of gully evolution and headcut advance are typically accomplished using traditional ground surveys and aerial photographs, with much recent research focused on integrating data collected at very high spatial resolutions using new techniques such as aerial surveys with blimps or kites and ground surveys with LiDar scanners. However, knowledge of specific processes that drive headcut advance is limited due to inadequate observation and documentation of flash floods and subsequent erosion that can occur at temporal resolutions not captured through repeat surveys. This paper presents a method for using very-high temporal resolution ground-based time-lapse photography to capture short-duration flash floods and gully head evolution in response. In 2004, a base level controlling concrete weir was removed from the outlet of a 129 ha semiarid headwater drainage on the Walnut Gulch Experimental Watershed in southeastern Arizona, USA. During the ten year period from 2004 to 2014 the headcut migrated upchannel a total of 14.5 m reducing the contributing area at the headwall by 9.5%. Beginning in July 2012, time-lapse photography was employed to observe event scale channel evolution dynamics. The most frequent erosion processes observed during three seasons of time-lapse photography were plunge pool erosion and mass wasting through sidewall or channel headwall slumping that occurred during summer months. Geomorphic change during the ten year period was dominated by a single piping event in August 2014 that advanced the channel head 7.4 m (51% of the overall advance) and removed 11.3 m(3) of sediment. High temporal resolution time-lapse photography was critical for identifying subsurface erosion processes, in the absence of time-lapse images piping would not have been identified as an erosion mechanism responsible for advancing the gully headwall at this site. Published by Elsevier B.V. |
英文关键词 | Gully erosion Piping Subsurface erosion Time-lapse photography |
类型 | Article |
语种 | 英语 |
国家 | USA |
收录类别 | SCI-E |
WOS记录号 | WOS:000378183000008 |
WOS关键词 | SEMIARID WATERSHEDS ; RETREAT RATES ; MIGRATION ; ARIZONA ; PLATEAU |
WOS类目 | Geography, Physical ; Geosciences, Multidisciplinary |
WOS研究方向 | Physical Geography ; Geology |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/193249 |
作者单位 | USDA, ARS, Southwest Watershed Res Ctr, 2000 E Allen Rd, Tucson, AZ 85719 USA |
推荐引用方式 GB/T 7714 | Nichols, M. H.,Nearing, M.,Hernandez, M.,et al. Monitoring channel head erosion processes in response to an artificially induced abrupt base level change using time-lapse photography[J],2016,265:107-116. |
APA | Nichols, M. H.,Nearing, M.,Hernandez, M.,&Polyakov, V. O..(2016).Monitoring channel head erosion processes in response to an artificially induced abrupt base level change using time-lapse photography.GEOMORPHOLOGY,265,107-116. |
MLA | Nichols, M. H.,et al."Monitoring channel head erosion processes in response to an artificially induced abrupt base level change using time-lapse photography".GEOMORPHOLOGY 265(2016):107-116. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。