Arid
DOI10.1016/j.energy.2015.11.015
2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile
Parrado, C.1; Girard, A.2; Simon, F.3; Fuentealba, E.1,4
通讯作者Parrado, C.
来源期刊ENERGY
ISSN0360-5442
EISSN1873-6785
出版年2016
卷号94页码:422-430
英文摘要

This study calculates the LCOE (Levelized Cost of Energy) on the PSDA (Atacama Solar Platform) for a solar-solar energy mix with the objective of evaluate new options for continuous energy delivery. LCOE was calculated for three 50 MW (megawatt) power plants: A PV (photovoltaic), a CSP (concentrated solar power) plant with 15 h TES (thermal energy storage) and a hybrid PV-CSP plant constituted with 20 MWp of PV and 30 MW of CSP with 15 h TES. Calculations present two scenario projections (Blue Map and Roadmap) until 2050 for each type of plant. Due to the huge solar resource available in northern Chile, the PV-CSP hybrid plant results to be a feasible option for electricity generation, as well as being effectively able to meet electricity demand profile of the mining industry present in the area. This type of energy could mitigate long-term energy costs for the heavy mining activity, as well as the country CO2 emissions. Findings point out that PV-CSP plants are a feasible option able to contribute to the continuous delivery of sustainable electricity in northern Chile. Moreover, this option can also contribute towards electricity price stabilization, thus benefiting the mining industry, as well as reducing Chile’s carbon footprint. (C) 2015 Elsevier Ltd. All rights reserved.


英文关键词LCOE PV CSP Mining industry Solar resource Hybrid
类型Article
语种英语
国家Chile ; Spain
收录类别SCI-E
WOS记录号WOS:000370111300035
WOS关键词RESOURCE ASSESSMENT ; SYSTEMS ; CSP ; OPTIMIZATION ; GENERATION ; MODEL
WOS类目Thermodynamics ; Energy & Fuels
WOS研究方向Thermodynamics ; Energy & Fuels
资源类型期刊论文
条目标识符http://119.78.100.177/qdio/handle/2XILL650/192546
作者单位1.Univ Antofagasta, CDEA, Ave Univ, Antofagasta 02800, Chile;
2.Univ Adolfo Ibanez, Ave Padre Hurtado 750, Vina Del Mar, Chile;
3.Univ Granada, Dept Civil Engn, Ave Severo Ochoa S-N, E-18071 Granada, Spain;
4.Solar Energy Res Ctr SERC Chile, Ave Tupper 2007,Piso 4, Santiago, Chile
推荐引用方式
GB/T 7714
Parrado, C.,Girard, A.,Simon, F.,et al. 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile[J],2016,94:422-430.
APA Parrado, C.,Girard, A.,Simon, F.,&Fuentealba, E..(2016).2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile.ENERGY,94,422-430.
MLA Parrado, C.,et al."2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile".ENERGY 94(2016):422-430.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Parrado, C.]的文章
[Girard, A.]的文章
[Simon, F.]的文章
百度学术
百度学术中相似的文章
[Parrado, C.]的文章
[Girard, A.]的文章
[Simon, F.]的文章
必应学术
必应学术中相似的文章
[Parrado, C.]的文章
[Girard, A.]的文章
[Simon, F.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。