Knowledge Resource Center for Ecological Environment in Arid Area
DOI | 10.1002/hyp.7333 |
Coupled surface water-groundwater model and its application in the Arid Shiyang River basin, China | |
Hu, Li-Tang2; Wang, Zhong-Jing1; Tian, Wei3; Zhao, Jian-Shi1 | |
通讯作者 | Wang, Zhong-Jing |
来源期刊 | HYDROLOGICAL PROCESSES |
ISSN | 0885-6087 |
EISSN | 1099-1085 |
出版年 | 2009 |
卷号 | 23期号:14页码:2033-2044 |
英文摘要 | The planning and management of water resources in the Shiyang River basin, China require a tool for assessing the impact of groundwater and stream use on water supply reliabilities and improving many environment-related problems Such as soil desertification induced by recent water-related human activities. A Coupled model, integrating rule-based lumped surface water model and distributed three-dimensional groundwater flow model, has been established to investigate surface water and groundwater management scenarios that may be designed to restore the deteriorated ecological environment of the downstream portion of the Shiyang River basin. More than 66% of the water level among 24 observation wells have simulation error less than 1.0 m. The overall trend of the temporal changes of simulated and observed surface runoff at the Caiqi gauging station remains almost the same. The calibration was considered satisfactory. Initial frameworks for water allocation, including agricultural water-saving projects, water diversion within the basin and inter-basin water transfer, reducing agricultural irrigation area and surface water use instead of groundwater exploitation at the downstream were figured out that would provide a rational use of water resources throughout the whole basin. Sixteen scenarios were modelled to find out the most appropriate management strategies. The results showed that in the two selected management options, the groundwater budget at the Minqin basin was about 1.4 x 10(8) m(3)/a and the ecological environment Would be improved significantly, but the deficit existed at the Wuwei basin and the number was about 0.8 x 10(8) m(3)/a. Water demand for domestic, industry and urban green area Would be met in the next 30 years, but the water shortage for meeting the demand of agricultural water use in the Shiyang River basin was about 2.2 x 108 m(3)/a. It is suggested that more inter-basin water transfer should be required to obtain sustainable water resource use in the Shiyang River basin. Copyright (C) 2009 John Wiley & Sons, Ltd. |
英文关键词 | numerical simulation surface water-groundwater ecological environment water resources management the Shiyang River basin |
类型 | Article |
语种 | 英语 |
国家 | Peoples R China |
收录类别 | SCI-E |
WOS记录号 | WOS:000268013600007 |
WOS关键词 | NORTHWEST CHINA ; FLOW ; SIMULATION ; MANAGEMENT ; REGIONS ; OASIS ; GIS |
WOS类目 | Water Resources |
WOS研究方向 | Water Resources |
来源机构 | 中国科学院西北生态环境资源研究院 ; 北京师范大学 ; 清华大学 |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/160935 |
作者单位 | 1.Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China; 2.Beijing Normal Univ, Coll Water Sci, Beijing 100875, Peoples R China; 3.Chinese Acad Sci, Cold & Arid Reg Environm & Engn Res Inst, Lanzhou 710000, Gansu, Peoples R China |
推荐引用方式 GB/T 7714 | Hu, Li-Tang,Wang, Zhong-Jing,Tian, Wei,et al. Coupled surface water-groundwater model and its application in the Arid Shiyang River basin, China[J]. 中国科学院西北生态环境资源研究院, 北京师范大学, 清华大学,2009,23(14):2033-2044. |
APA | Hu, Li-Tang,Wang, Zhong-Jing,Tian, Wei,&Zhao, Jian-Shi.(2009).Coupled surface water-groundwater model and its application in the Arid Shiyang River basin, China.HYDROLOGICAL PROCESSES,23(14),2033-2044. |
MLA | Hu, Li-Tang,et al."Coupled surface water-groundwater model and its application in the Arid Shiyang River basin, China".HYDROLOGICAL PROCESSES 23.14(2009):2033-2044. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。