Ma’rib Dam and irrigation project - a wonder in the desert | |
Chakraborty, R | |
来源期刊 | PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING
![]() |
ISSN | 0965-089X |
出版年 | 2005 |
卷号 | 158期号:4页码:170-177 |
英文摘要 | Building major infrastructure projects in adverse social and climatic conditions is never easy. The Ma’rib irrigation project In Yemen is a classic case, with the 65 pound million scheme taking over 30 years to complete. Civil unrest, tribal feuds, flash floods and windblown sand all played their part in its delay, but work is finally scheduled to be completed next year. A total of 74 km(2), including nearly 50 km(2) Of former desert, will soon be irrigated by the country’s largest dam, enabling the land to be farmed again-as it was in ancient times. This paper describes the design and prolonged construction of this technologically straightforward yet hugely challenging and beneficial civil engineering project. |
英文关键词 | dams, barrages & reservoirs drainage & irrigation floods & floodworks |
类型 | Article |
语种 | 英语 |
收录类别 | SCI-E |
WOS记录号 | WOS:000233232100006 |
WOS类目 | Engineering, Civil |
WOS研究方向 | Engineering |
资源类型 | 期刊论文 |
条目标识符 | http://119.78.100.177/qdio/handle/2XILL650/150239 |
推荐引用方式 GB/T 7714 | Chakraborty, R. Ma’rib Dam and irrigation project - a wonder in the desert[J],2005,158(4):170-177. |
APA | Chakraborty, R.(2005).Ma’rib Dam and irrigation project - a wonder in the desert.PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING,158(4),170-177. |
MLA | Chakraborty, R."Ma’rib Dam and irrigation project - a wonder in the desert".PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING 158.4(2005):170-177. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[Chakraborty, R]的文章 |
百度学术 |
百度学术中相似的文章 |
[Chakraborty, R]的文章 |
必应学术 |
必应学术中相似的文章 |
[Chakraborty, R]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。