Arid

浏览/检索结果: 共4条,第1-4条 帮助

已选(0)清除 条数/页:   排序方式:
A long-term application of a pilot airlift membrane bioreactor for domestic wastewater treatment 会议论文
会议名称: 2nd International Conference on Wastewater Treatment in Small Communities (SmallWat07). 会议地点: Seville, SPAIN. 会议日期: NOV 11-15, 2007
作者:  Yang, Fei;  Wang, Ying;  Bick, Amos;  Brenner, Asher;  Oron, Gideon
收藏  |  浏览/下载:25/0  |  提交时间:2019/12/07
Airlift membrane bioreactor  Crossflow velocity  Draft tube  Membrane fouling  Unrestricted reuse  
A long-term application of a pilot airlift membrane bioreactor for domestic wastewater treatment 期刊论文
发表期刊: DESALINATION AND WATER TREATMENT. 出版年: 2009, 卷号: 4, 期号: 1-3, 页码: 212-217
作者:  Yang, Fei;  Wang, Ying;  Bick, Amos;  Brenner, Asher;  Oron, Gideon
收藏  |  浏览/下载:18/0  |  提交时间:2019/11/28
Airlift membrane bioreactor  Crossflow velocity  Draft tube  Membrane fouling  Unrestricted reuse  
Optimal performance of an immersed membrane bioreactor equipped with a draft tube for domestic wastewater reclamation 会议论文
会议名称: 5th World Water Congress of the International-Water-Association. 会议地点: Beijing, PEOPLES R CHINA. 会议日期: SEP 10-14, 2006
作者:  Yang, F.;  Bick, A.;  Shandalov, S.;  Oron, G.
收藏  |  浏览/下载:26/0  |  提交时间:2019/12/07
aeration  crossflow velocity  draft tube  immersed membrane bioreactor  membrane fouling  transmembrane pressure  
Optimal performance of an immersed membrane bioreactor equipped with a draft tube for domestic wastewater reclamation 期刊论文
发表期刊: WATER SCIENCE AND TECHNOLOGY. 出版年: 2006, 卷号: 54, 期号: 10, 页码: 155-162
作者:  Yang, F.;  Bick, A.;  Shandalov, S.;  Oron, G.
收藏  |  浏览/下载:10/0  |  提交时间:2019/11/28
aeration  crossflow velocity  draft tube  immersed membrane bioreactor  membrane fouling  transmembrane pressure