Arid
DOI10.2172/1260243
报告编号N/A
来源IDOSTI_ID: 1260243
Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska
[unavailable], [unavailable]
英文摘要This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.
出版年2015
报告类型Technical Report
语种英语
国家美国
来源学科分类02 PETROLEUM
URLhttp://www.osti.gov/scitech/servlets/purl/1260243
资源类型科技报告
条目标识符http://119.78.100.177/qdio/handle/2XILL650/271114
推荐引用方式
GB/T 7714
[unavailable], [unavailable]. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska,2015.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[[unavailable], [unavailable]]的文章
百度学术
百度学术中相似的文章
[[unavailable], [unavailable]]的文章
必应学术
必应学术中相似的文章
[[unavailable], [unavailable]]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。